How often has a product been planned to be sold or used in production, only to find the batch was near its expiry date or had actually expired? The result: an inventory stock-out, a potential lost customer order, lost revenue and profits, and an obsolete inventory write-off. By combining a warning period prior to expiry with a calculated planned inspection date, CompuTec ProcessForce uses these features in conjunction with SAP Business One alerts and workflow tools to help reduce these business issues and maximize the use and profit generation of batch-controlled materials.

CompuTec ProcessForce Additional Batch Details, Date Details tab with expiry, inspection, and warning dates